BRE (Building Research Establishment) is an independent, research-based consultancy, testing and training organisation, operating in the built environment and associated industries.
On 21 April 2017, BRE published; Understanding the factors affecting flashover of a fire in modern buildings (IP 2/17), written by Richard Chitty.
- The development of a fire in an enclosure can be categorised as:
- Ignition and growth.
- Fully developed.
- Decay and burnout.
The term ‘flashover’ refers to the transition of an enclosure or room fire from a localised fire to the ignition of all exposed flammable surfaces, creating conditions where life is no longer tenable. The time to flashover is important in determining the impact on; escaping occupants, firefighting tactics and the building structure.
Theoretical and experimental investigations involving flashover have been undertaken since the 1950s. Initially they involved small enclosures and scale models, used to identify the basic mechanisms of flashover in the context of domestic buildings, cellular offices and similar-sized enclosures. While this work is still relevant today for similar enclosures, different mechanisms may also be involved, or become dominant, in particular in very large or highly-insulated modern spaces.
This 12-page information paper explains the process of flashover and the factors that influence its occurrence and development. It is intended for fire risk assessors, fire safety managers, other safety managers and building managers with some responsibility for safety, as well as community fire safety officers, firefighters and fire investigators. It will also be useful for those who are new to fire safety engineering.
The contents of the information paper are:
- Introduction.
- Development of a fire.
- Fires in an enclosure.
- Thermal instability.
- Quantifying the conditions for flashover.
- Example calculations for time to flashover.
- Discussion and conclusions.
- References and further reading.
[edit] Related articles on Designing Buildings Wiki
- Automatic fire detection and alarm systems, an introductory guide to components and systems BR 510.
- Automatic fire sprinkler systems: A good practice guide.
- BRE articles on Designing Buildings Wiki.
- BRE Buzz articles on Designing Buildings Wiki.
- Building Research Establishment BRE.
- External fire spread, Supplementary guidance to BR 187 incorporating probabilistic and time-based approaches.
- External fire spread: building separation and boundary distances (BR 187).
- Fire in buildings.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Fire spread.
- The causes of false fire alarms in buildings.
- The role of codes, standards and approvals in delivering fire safety.
- Visual alarm devices - their effectiveness in warning of fire.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February